Overview of:

Requirements

Key Requirements Organizations

Requirements Overview

Key Requirements Organizations

DoD Requirements: From JCIDS to the Joint Force Requirements Process

The Department disestablished the Joint Capabilities Integration and Development System (JCIDS) in 2025 and replaced it with the Joint Force Requirements Process (JFRP). The JFRP shifts requirements validation to the Services, gives the Joint Requirements Oversight Council (JROC) a narrower mandate to rank the Joint Force's hardest problems, and ties that ranking directly to budget decisions.

Why JCIDS Was Replaced

On 20 August 2025, the Secretary of War and Deputy Secretary of War directed a full reform of joint requirements determination, following Executive Order 14265, "Modernizing Defense Acquisitions and Spurring Innovation in the Defense Industrial Base." JCIDS had grown into a slow, document-heavy validation system. Legacy JCIDS timelines ran 40 to 100 days on paper; while the real average closer to 300 days.

The reform memo set three objectives:

  • Streamline and accelerate identification of the Joint Force's top priority needs and the solutions to fill them.
  • Engage industry earlier as the Department converts capability gaps into fielded systems.
  • Integrate requirements determination with resource prioritization so budget decisions track the most critical needs.

Joint Staff disestablished JCIDS and established the Joint Force Requirements Process per the Instruction and Manual below.

How the New Joint Force Requirements Process Works

  • The JROC identifies and ranks Joint Operational Problems (JOPs). JOPs describe a warfighting challenge, not a solution. The JROC ranks them annually against strategy, threat, and Combatant Command input.
  • Capability Portfolio Management (CPM) analyzes the top JOPs. Functional Capabilities Boards lead cross-Department assessments of gaps and candidate solutions.
  • The Mission Engineering and Integration Activity (MEIA) engages industry and runs experiments. MEIA translates JOPs into technical sub-problems and tests candidate solutions against them.
  • The Requirements and Resourcing Alignment Board (RRAB) allocates funding, drawing on a dedicated reserve, the Joint Acceleration Reserve (JAR), during the Program Budget Review.
  • Services field capabilities at their own speed, sharing approved requirements and program data with the Joint Staff to preserve joint visibility without adding new review layers.

Requirements

JROC Boards and Support Orgs

Requirements Documents and Pathways

The JFRP replaces JCIDS validation with a lighter review called Joint Capability Integration (JCI). Four points define how it works:

  • Services validate their own requirements. The JROC no longer approves Service documents. Services run their own boards (for example, the Army Requirements Oversight Council) and their own document formats (for example, the Air Force's Strategic Requirements Document or the Navy's Top-Level Requirements document).
  • JCI is a lighter joint-awareness check, not a gate. It runs in parallel with Service acquisition activity, after Service validation, so it does not delay fielding.
  • Joint Immediate Combatant Command Requirements (JICRs) replace JUONs and JEONs. A JICR covers an urgent Combatant Command need that, left unfilled, risks certain death or failure of a primary objective. It carries a tight 30-business-day assessment window and a hard 1-year initial fielding, 2-year full fielding standard, with mandatory reviews after.
  • CCMD Derived Requirements (CDRs) give a Combatant Command a lighter-weight document for needs that do not meet the JICR bar but need more specificity than an Integrated Priority List entry.

Some of the legacy JCIDS requirements documents that are still in use by the Services include: